Skip To Main Content

Facility Survey Information 2024

Since our last facility survey, the Lake Mills Area School District has been revising our long-range facilities plan to address our most pressing needs. The goal of the survey was to determine what projects, if any, should be done.

All district residents received a survey in the mail by mid-April. Residents were asked to complete the survey by May 6. The survey code could only be used once. To obtain additional surveys for other adults in their household, residents were instructed to call the District Office at 920.648.2215, ext. 361.

To begin this process, the District updated the facilities assessment and established the Collaborative Advisory Team (a committee of 42 people, including staff, parents, community members, and local business representatives). Over the last year, this group studied the facilities assessment, prioritized our needs, and recommended the projects explained in the survey.

 

Facility Survey Results

THANK YOU to our families, staff, and community members who completed the facility survey! 

Rob DeMeuse, Research Director for School Perceptions, presented the results of the community facility survey at a Special School Board Meeting on Monday, June 3, 2024.

Key survey findings include:

  • 86% of staff (residents only) respondents support the base plan

  • 68% of parent respondents support the base plan

  • Non-parent, non-staff respondents were evenly split at 46% in support of the base plan, with 46% not in support

Respondents who replied “No” to the plan stated the biggest reason was that $0.16 per $1,000 of property value was too expensive (78%). Respondents noted that the District is doing a good job of delivering a high-quality education (79%) and building pride in the community (78%).

Statistically, School Perceptions places more weight on the non-parent/non-staff results in determining the likelihood of passing a referendum. When that formula was applied to the results, the support for the base plan was 51.5% with a +/- 3% error. If the referendum for the base plan were held today, the outcome would be too close to call. However, there is enough support to consider taking a plan to referendum in November.

The Collaborative Advisory Team will meet on June 12 at 6:00 pm to determine a recommendation for the School Board regarding the next steps in the facility planning process.

 

Base Plan

Option Development Components

  • Prioritized Capital Maintenance items 
  • Diagrammatic Site and Floor plans
  • Square footage, level of renovation, and general description of intent will inform pricing estimates 

Additional Projects

Completing these additional projects along with the base plan as part of the long-range facilities plan would save money and time compared to doing them separately later. The Base Plan updates these areas but does not expand them. 

Hypothetical Referendum Tax Impact

The mill rate impacts for the debt portion of the mill rate are as follows:

  • Base Plan $51.2 million = $0.16 per $1,000

Additional Projects:

  • Music and Kitchen /Cafeteria $15.2 million = $0.65 per $1,000

  • Outdoor Athletics $6.7 million = $0.30 per $1,000